《专业英语》课件Unit-30.pptx
- 【下载声明】
1. 本站全部试题类文档,若标题没写含答案,则无答案;标题注明含答案的文档,主观题也可能无答案。请谨慎下单,一旦售出,不予退换。
2. 本站全部PPT文档均不含视频和音频,PPT中出现的音频或视频标识(或文字)仅表示流程,实际无音频或视频文件。请谨慎下单,一旦售出,不予退换。
3. 本页资料《《专业英语》课件Unit-30.pptx》由用户(momomo)主动上传,其收益全归该用户。163文库仅提供信息存储空间,仅对该用户上传内容的表现方式做保护处理,对上传内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知163文库(点击联系客服),我们立即给予删除!
4. 请根据预览情况,自愿下载本文。本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
5. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007及以上版本和PDF阅读器,压缩文件请下载最新的WinRAR软件解压。
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 专业英语 专业 英语 课件 Unit_30
- 资源描述:
-
1、TextWith the reform and opening up,Chinas rapid economic and social development,a strong impetus to Chinas urbanization process,and the increasing scale of construction in the overall construction of the construction process,a variety of techniques and methods of construction and design whole buildi
2、ngs are an important impact,so take reasonable and effective form of construction techniques and construction of buildings can greatly improve the overall quality and effectively shorten the construction period.Modern building technology development and application,to the development of Chinas const
3、ruction industry have injected new vigor and vitality.Article on building technology in earthwork construction technology,architectural precast concrete piles of high-tech technology and low carbon building technology,etc.carried out a detailed exposition and analysis.A construction engineering eart
4、hworks construction technology in construction earthworks including all soil excavation,filling and transportation processes and drainage,precipitation,soil wall support and ancillary works and other preparatory work.Most common earthworks including site preparation,pit(trench)excavation,floor filli
5、ng,roadbed construction and excavation backfill,etc.TextDesign elevation general requirements:large projects usually have to determine site design plane for ground leveling.ground leveling is to transform the natural ground into people required plane.venue design elevation should meet planning,produ
6、ction processes and transport,drainage and the highest flood level requirements,and strive to make the venue balanced and earthwork cut and fill earthwork minimum.design elevation determination method:general methods such as venue relatively flat,the elevation of the site design without special requ
7、irements,in accordance with the principle of equal cut and fill earthwork site design elevation to determine the actual engineering of the calculated design elevation,the following factors should be considered to be adjusted,the completion of this work earthwork calculation after considering soil ev
8、entually loose sex,you need a corresponding increase in the design elevation to reach the earthwork of the actual balance of the projects soil or engineering with soil,a corresponding increase or decrease the design elevation,according to the economic results of the comparison,such as the use off-si
9、te soil or spoil the construction program,you should consider thus causing changes in the amount of earthwork,the need to design elevation adjustment.adjustment Plane Site Design work is also heavy,such as modifying the design elevation shall be recalculated earthworks volume.TextTwo precast concret
10、e pile construction technology in modern architectural projects,multi-storey buildings generally better to use more locally-based natural shallow foundation,it low cost,simple construction,if the soil is weak natural light,can be mechanical pressure real,dynamic compaction,preloading,deep mixing,che
11、mical methods such as artificial reinforcement reinforcement,form an artificial foundation.Piling preparatory work before:before piling the following preparations:Clear hinder the construction of the above-ground and underground obstructions,flat construction site positioning actinomycetes,set the p
12、ower supply,water supply systems,installation piling machines.pile axis of the anchor point and standard points should be set up without piling on the impact of the location,level of not less than two set points in the then be able to check the construction process deviation pile and pile embedded d
13、epth.piling techniques below.Hammers in place,it will lift the pile hammer and pile cap,and then hanging pile and sent to the guide rod,the vertical alignment to send the next pile slowly into the soil,vertical deviation may not exceed 0.5%,and then fixed pile cap and pile hammer,making piles,pile c
14、aps,pile hammer on the same vertical line,to ensure that the pile can be vertical sinking in the pile hammer and pile caps should be added between the flexible liner,pile cap and pile around four weeks should be 5 10mm gap,to prevent damage top of the pile,piling starts,the hammer should fall away f
15、rom the small pile to be buried to a certain depth and stable,and then fall from the hammering required.Textuse single-action steam hammer or hammer piling,the maximum drop distance should not be more than 1m,diesel hammer,hammer beating normally should be made in the piling process,in case of penet
16、ration upheaval,pile sudden tilt,shift or serious rebound,or the top of the pile pile severe abnormalities such as cracks or broken,it should be suspended piling,timely study treatment,such as pile top elevation below the natural soil surface,you need to use to send pile pipe into the soil when the
17、pile,pile and pile delivery tube longitudinal axis of the line should be in the same line,pull out the delivery pipe pile after pile hole should be backfilled or capped,then pile pile multi-section,can be welded or flanged anchor.Currently the most widely used welding then pile.Then pile pre-buried
18、iron surface should be clean,the upper and lower sections if the gap between the application pile infill weld metal plates,welding seam should be continuous and full,and take measures to reduce the welding deformation.Then pile,the upper and lower sections of pile centerline deviation of not more th
19、an 10mm,node bending vector height not greater than 1 pile length.Piling quality control:quality checks including piles piling deviation,the last pile penetration and elevation,top of the pile,the pile is broke and right without causing serious harm to the surrounding environment.pile vertical devia
展开阅读全文