《专业英语》课件Unit-24.pptx
- 【下载声明】
1. 本站全部试题类文档,若标题没写含答案,则无答案;标题注明含答案的文档,主观题也可能无答案。请谨慎下单,一旦售出,不予退换。
2. 本站全部PPT文档均不含视频和音频,PPT中出现的音频或视频标识(或文字)仅表示流程,实际无音频或视频文件。请谨慎下单,一旦售出,不予退换。
3. 本页资料《《专业英语》课件Unit-24.pptx》由用户(momomo)主动上传,其收益全归该用户。163文库仅提供信息存储空间,仅对该用户上传内容的表现方式做保护处理,对上传内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知163文库(点击联系客服),我们立即给予删除!
4. 请根据预览情况,自愿下载本文。本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
5. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007及以上版本和PDF阅读器,压缩文件请下载最新的WinRAR软件解压。
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 专业英语 专业 英语 课件 Unit_24
- 资源描述:
-
1、TextEstimating is determining how to construct the specified work in the most economical manner and wihin the time allowed by the conract1.The format of all esimates should be as possible.A work breakdown structure should be esablished for this purpose.An alternate mathod to detaied task-by-task est
2、imate preparation,especially in the early stages of project development when details are not available,is parametric esimating.Direct costs are those costs that can be aributed to a single task of construction work.Indirect costs are those costs that cannot be attributed to a single task of construc
3、tion work2.1.IntroducionOne of the most consequential elements that govern the success of a construction company is the ability to prepare fully detailed and accurate estimates for the cost of performing work.In many companies the estimator is one of the most highly paid positions.For a typical faci
4、lity,cost estimates can be divided into a series of different types throughout the projects development and life(Fig.24-1).The types of estimates are:TextFig24-1Esimate accuracy versus percenage of engineering completeText1.1Estimating for conceptual planning.An esimate at this stage in a projects d
5、evelopment is,by necessiy,based on only very general parameters of facility size,anticipated quality of construction,and use of the facility3.Such a conceptual estimate should be prepared with considerable input from the projec owner.The owner should approve the scope document that serves as the est
6、imate as the scope identifies the baseline from which the estimae is derived.The accuracy expected is in the order of plus or minus 15 to 25%.These esimates are prepared for early budgets to determine project feasibility and to develop project financing.1.2Estimaes for feasibility.Using preliminary
7、design information and after project scope is completely defined,a broad budget feasibily estimae can be prepared.Major items of equipment can be priced and their costs input into the esimate.The local labor market should be checked for qualified craftsmen.With the better scope definition,the accura
8、cy expected is in the order of plus or minus 10 to15%.1.3Esimates during engineering and design.Based on schematic level design documents,major quantities can be quantified(ton of steel)and types of construction(steel vs.concrete)identified.An estimate with an accuracy of plus or minus 5 to 10%can b
9、e prepared at this point in project design.Text1.4Estimates for construction.These are iemized cost computaions based on a complete set of contract documents.Construction estimates can be prepared using historical average costs or by creating crews and considering their production.The method employe
10、d depends on the type of work.Building work contractors seem to make greater use of historical daa whereas heavy/highway contractors typically estimate using crew production.In either case the expected accuracy is plus or minus 5%.1.5Esimates for change orders.These are generally performed on the pr
11、oject site in response to an owner-directed change in project scope.To provide a consistent set of elements that are applicable to bidding,budgeting,and for change order preparation,uniform methods must be employed in the asssembly of the estimate.Therefore,this chapter describes methods,procedures,
12、and formats for the preparation of construcion cost estimates.All expected costs should be included in the cost estimate.An engineers estimate should be developed as accurately as possible,in as much detail as can be assumed,and should be based on the best information available4.Text2.Estimating Met
13、hodologyWhenever adequate design information is known,detailed estimating methods are to be employed.When details cannot be reasonably assumed,historical unit prices can be used.The methodologies and procedures described here are applicable whether the cost estimate is prepared manually or by using