[全]CPIM供应链资格考试题库含答案.docx
- 【下载声明】
1. 本站全部试题类文档,若标题没写含答案,则无答案;标题注明含答案的文档,主观题也可能无答案。请谨慎下单,一旦售出,不予退换。
2. 本站全部PPT文档均不含视频和音频,PPT中出现的音频或视频标识(或文字)仅表示流程,实际无音频或视频文件。请谨慎下单,一旦售出,不予退换。
3. 本页资料《[全]CPIM供应链资格考试题库含答案.docx》由用户(2023DOC)主动上传,其收益全归该用户。163文库仅提供信息存储空间,仅对该用户上传内容的表现方式做保护处理,对上传内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知163文库(点击联系客服),我们立即给予删除!
4. 请根据预览情况,自愿下载本文。本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
5. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007及以上版本和PDF阅读器,压缩文件请下载最新的WinRAR软件解压。
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CPIM 供应 资格考试 题库 答案
- 资源描述:
-
1、CPIM供应链资格考试题库含答案The question below is based on the following information: Which of the followingdistributions would be the central warehouse allocation of 120 units of inventory to districtwarehouses A, B, and C if the equal run-out method were used?Warehouse Daily usage On-hand inventoryA 10 60B 30
2、 160C 20 14020 units to A, 60 units to B, 40 units to C20 units to A, 80 units to B, 20 units to C ()100 units to A, 0 units to B, 20 units to C20 units to A, 53 units to B, 47 units to CA warehouse has 20,000 orders per year with an average of 10 line items per order. The warehouse experiences 800
3、backorders per year averaging 5 line items per backorder. What level of customer service is achieved when the percentage of line items shipped onschedule is used?96%97%98% (正确答案)99%Which of the following communicates in-transit inventories to a warehouse?Bill of distributionMaster scheduleOrder ackn
4、owledgment to warehouseDistribution requirements planning ()Which of the following data is an input to distribution requirements planning?Location pointsOrder valueShipping schedulesInterplant demand (正确答案)Which of the following issues is most likely to lead to the use of a short-term, rather than l
5、ong-term,forecasting process?How to respond to a competitors test marketing of a new product (正确答案)How to configure the supply chain to support a new market segmentWhether to outsource a capital-intensive subassembly processWhether to take a price-leadership or a product-differentiation postureWhich
6、 of the following factors has the greatest effect on the length of the forecast horizon?Cumulative product lead timePurpose of the forecast (正确答案)Frequency of forecast revisionSize of forecast periodWhich of the following statements about both econometric models and market research is true?They can
7、be used in place of adaptive smoothingThey are useful in aggregate planning ()They are useful in forecasting at the stockkeeping unit levelThey are examples of intrinsic forecasting techniquesWhen quantitative data are being evaluated, a very small bias in a forecast can best be explained by which o
8、f the following statements?The absolute values of all forecast errors were approximately equal.The variability of forecast data was skewedA very small alpha factor was used.Positive forecast errors approximately offset negative forecast errors ()The forecast tracking signal is the ratio of the:cumul
9、ative error to the MAD. ()cumulative error to the forecastforecast to the MADstandard deviation to the MADA demand filter can best be used for which of the following purposes?To remove seasonal variability from forecast dataTo remove scrap loss from a work center historyTo adjust the alpha factorTo
10、flag a large order ()Elements calculated in the master scheduling process includeallocations.time fences.service-parts forecastavailable-to-promise ()Available-to-promise data facilitates the process ofinventory planningcapacity planningforecastingorder entry (正确选项)A bill of resources typically cont
11、ains information about a productsinventory balanceskey work centers ()production schedulecomplete list of componentsWhich of the following actions is best for a company to take when a 2-week plant shutdown for retooling is planned for the next year?Increase planned production (正确答案)Alter the strateg
12、ic planIncrease material requirements planning safety-stock levelsDecrease the planned sales level during the shutdownThe most effective way to cope with uncertainty of demand and to improve customer service is to reduce:lead times (正确答案)backlogssafety stockproduct optionsWhich of the following tool
13、s is used to accommodate forecast errors when developing the master production schedule?Planning time fenceFirm planned ordersSafety stock ()Available-to-promiseIn an assemble-to-order environment, which of the following factors is most significant in determining which items should be master schedul
14、ed?Size of the forecast errorLength of the master schedule horizonNumber of levels in the bill of materialNumber of product options (正确答案)Rough-cut capacity planning is best used to:determine labor requirementsestablish order prioritiesassess the load on a work centerevaluate the master production s
15、chedule (正确选项)The question below is based on the following information: Which of the following weekly production rates best supports these criteria?In a repetitive manufacturing environment where a level production rate must be maintained, the following customer backog must be satisfied with NO late
16、 shipment;Week Customer backlog qty1 782 683 904 585 56707880 ()90Translation of a master production schedule directly into key resources results in a:bill of laborproduction schedulefinal assembly schedulerough-cut capacity plan (正确选项)Which of the following statements is true about items that appea
17、r on a final assembly schedule?They are used as input to the production planThey are released without regard for component availabilityThey are stated in terms of end items or customer orders (正确选项)They do not appear on a shipment scheduleIn a capacity-constrained situation, which of the following a
18、ctions is best to take if marketing wants to increase production of a master schedule item?Increase production of the item, but do not make any other changesIncrease production of the item, and decrease production of another item ()Increase production of the item, and change the production planIf th
19、e item is within the demand time fence, let the computer make the changeautomaticallyIf the master production schedule is overstated, which of the following short-term actions is most appropriate?The demand time fence should be moved outLot sizes should be decreasedSafety stocks should be decreasedF
20、irm planned orders should be rescheduled (正确答案)In an assemble-to-order environment, which of the following indicators is most appropriatefor measuring the effectiveness of the master scheduling process?Number of stockoutsCapacity utilizationCustomer order fill rate (正确答案)Aggregate inventoryProductio
21、n is being planned to emphasize the utilization of a critical and very expensivepiece of capital equipment. Which of the following production planning strategies should beused?ChaseLevel ()Cost-basedCombinationSales and operations planning in a make-to-stock environment is concerned with projectingi
22、tem forecastsinventory ()backlogbookingsWhich of the following forecasting methods is most appropriate for projecting demand for aproduct family?Single exponential smoothingPyramid (正确答案)FocusSimple averageThe greatest risk of aggregating product families at too high of a level for sales andoperatio
23、ns planning is that:it will be more difficult to reconcile the sales plans with the business planimbalances between the demand plan and resources may not be visible (正确答案)the resource planning process will be more complicatedthe sales forecasts will not be as accurate for the larger product families
展开阅读全文