101 Notice of Suspension.doc
- 【下载声明】
1. 本站全部试题类文档,若标题没写含答案,则无答案;标题注明含答案的文档,主观题也可能无答案。请谨慎下单,一旦售出,不予退换。
2. 本站全部PPT文档均不含视频和音频,PPT中出现的音频或视频标识(或文字)仅表示流程,实际无音频或视频文件。请谨慎下单,一旦售出,不予退换。
3. 本页资料《101 Notice of Suspension.doc》由用户(无敌的果实)主动上传,其收益全归该用户。163文库仅提供信息存储空间,仅对该用户上传内容的表现方式做保护处理,对上传内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知163文库(点击联系客服),我们立即给予删除!
4. 请根据预览情况,自愿下载本文。本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
5. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007及以上版本和PDF阅读器,压缩文件请下载最新的WinRAR软件解压。
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 101 Notice of Suspension
- 资源描述:
-
1、Heading *CORPORATION LIMITEDDIAR DUSHANBE PROJECT PHASE 1Our Ref: /DDP/PE1/12/096 Date: October 21, 2012To: Mr. EngineerCC: IMS & the EmployerSubject: Notice of Suspension as per Sub-Clause 16.1 Contract ID: 55002348 Construction of Diar Dushanbe Project - Phase1The letters to be referred as follows
2、 in such chronological order:1) Ref No. QDT/2012-95 dated on 12th September 20122) Ref No.SHY/DDP/PE1/12/049 dated on 19th September 20123) Ref No.SHY/DDP/PE1/12/055 dated on 24th September 20124) Ref No. ODT/2012-111 dated on 4th October 20125) Ref No. QDDP-IMS-SNH-121005-792 dated on 5th October 2
3、0126) Ref No. SHY/DDP/PE1/12/080 dated on 9th October 20127) Ref No. SHY/DDP/PE1/12/079 dated on 9th October 20128) Ref No.QDT/2012-114 dated on 15th October 20129) Ref No. QDDP-IMS-SNH-121019-812 dated on 19th October 201210) Ref No. SHY/DDP/PE1/12/095 dated on 21st October 2012_Dear Sir,It is reca
4、lled that the Employer has confirmed with the ICBC Doha Branch on the meeting held in QD Headquarter on 12th September 2012 that the templates of PG & APBG as made part of the Contract Document in Pages 0155 through 0159 shall be followed as mentioned in the Ref.1). Subsequently, we furnished the Em
5、ployer with the agreed APG on 24th September 2012 through the Ref.3). Unfortunately, the Employer further notified the Contractor through its Agent IMS to amend the APG by incorporation of the following viz. “This Guarantee Bond and the benefit thereof shall not be assigned without the prior written
6、 consent of the Guarantor and the Contractor, such consent not to be unreasonably withheld or delayed.” Ref. 4) &5). We understand that the amendment as requested by the Employer is totally inconsistent with the agreement reached previously, which consequentially resulted into the process being unfo
7、reseeably stretched onwards. Upon receipt of such notification, we immediately replied the Employer with our explicit point of views and the relevant historical scenarios for earlier finalization in this regard as referred above No.6). Meanwhile, we submitted the Interim Payment Application No.1 for
8、 advance payment as entitled under the Contract through our letter Ref. 7) on 9th October 2012 for Payment Certification. We kindly draw your attention to the Sub-Clause 14.7 Paymentquote “the Employer shall pay to the Contractor (a) the first installment of the advance payment within 42days after i
9、ssuing the Letter of Acceptance or within 21days after receiving the documents in accordance with Sub-Clause 4.2 Performance Security and Sub-Clause 14.2 Advance Payment, whichever is later;”-unquote. Till date, we have contractually fulfilled to provide you with the PB through the Ref. 2) and the A
10、PG by 24th September 2012. Accordingly, the advance payment due to the Contractor shall be effected prior to the Day 15th October 2012 because the deadline as specified is within 21days since from the provision of both the PG &APG. More worse is that the Employer again issued us a letter under the R
展开阅读全文