书签 分享 收藏 举报 版权申诉 / 2
上传文档赚钱

类型138 Resubmission of the Construction Programme Revision 03 Eng.doc

  • 上传人(卖家):无敌的果实
  • 文档编号:305549
  • 上传时间:2020-02-26
  • 格式:DOC
  • 页数:2
  • 大小:47KB
  • 【下载声明】
    1. 本站全部试题类文档,若标题没写含答案,则无答案;标题注明含答案的文档,主观题也可能无答案。请谨慎下单,一旦售出,不予退换。
    2. 本站全部PPT文档均不含视频和音频,PPT中出现的音频或视频标识(或文字)仅表示流程,实际无音频或视频文件。请谨慎下单,一旦售出,不予退换。
    3. 本页资料《138 Resubmission of the Construction Programme Revision 03 Eng.doc》由用户(无敌的果实)主动上传,其收益全归该用户。163文库仅提供信息存储空间,仅对该用户上传内容的表现方式做保护处理,对上传内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知163文库(点击联系客服),我们立即给予删除!
    4. 请根据预览情况,自愿下载本文。本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
    5. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007及以上版本和PDF阅读器,压缩文件请下载最新的WinRAR软件解压。
    配套讲稿:

    如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。

    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    138 Resubmission of the Construction Programme Revision 03 Eng
    资源描述:

    1、DIAR DUSHANBE PROJECT PHASE 1Ref No: SHY/DDP/PE1/12/138 Date: 22nd Nov. 2012To: Mr. Sadettin Otluoglu Resident EngineerDAR Muhendislik Musavirlik A.S.AINI Street 24a “Markazai Tijori” CJSC “S.A.S”, 3rd FloorDushanbe, Tajikistan 734012Tel: +992(44)601 92 88RE: Contract ID: 55002348 Construction of Di

    2、ar Dushanbe Project - Phase1Subject: Resubmission of Contractors Construction Programme (Version 03) Your Ref.: Letter QDDP-IMS-SNH-121005-794 dated on 5th Oct. 2012 Letter TJ10079/S/691 dated on 5th Nov. 2012 Letter QDDP-IMS-SNH-121113-860 dated on 13th Nov. 2012Other Ref.: Our letter SHY/DDP/PE1/1

    3、2/060 dated on 5th Sep. 2012 Our letter SHY/DDP/PE1/12/118 dated on 7th Nov. 2012_Dear Sir,Your response to our letter 118 has been duly noted by the Contractor and we hereby resubmit the Programme in accordance with the Sub-Clause 8.3 for your review and approval. Please be noted that break-down of

    4、 the WBS, all activities, the resource allocation/loading & monetary value of activity (coordinated with the BOQ) and any necessary reports as requested have been reasonably incorporated. Besides that, we kindly draw your attention to the Sub-Clause 8.3 “The Contractor shall promptly give notice to

    5、the Engineer of specific probable future events or circumstances which may adversely affect the work, increase the Contract Price or delay the execution of the Works.”, and you may understand that the coming winter season shall be considered as a future circumstances which will adversely affect the

    6、work. Please evaluate the same in these respects and accordingly, we will submit the revised Programme in accordance with Sub-Clause .8.6 in due course. Assuring you our best cooperation at all times, as always.Yours faithfully,Project Manager of * Tajikistan Cor. LimitedEnclosures: 1. Construction Programme (A3 size, ?pages)2. Necessary Supporting Reports CC: Mr. Rakesh Pant, QD Project ManagerMr. Ahmet Ziya Akyil, IMS Project Manager

    展开阅读全文
    提示  163文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
    关于本文
    本文标题:138 Resubmission of the Construction Programme Revision 03 Eng.doc
    链接地址:https://www.163wenku.com/p-305549.html

    Copyright@ 2017-2037 Www.163WenKu.Com  网站版权所有  |  资源地图   
    IPC备案号:蜀ICP备2021032737号  | 川公网安备 51099002000191号


    侵权投诉QQ:3464097650  资料上传QQ:3464097650
       


    【声明】本站为“文档C2C交易模式”,即用户上传的文档直接卖给(下载)用户,本站只是网络空间服务平台,本站所有原创文档下载所得归上传人所有,如您发现上传作品侵犯了您的版权,请立刻联系我们并提供证据,我们将在3个工作日内予以改正。

    163文库